-40%

[NEW]CAMPING MOON Peg Tent Solid Stake Carbon Steel for Machine Structural Use/K

$ 25.86

Availability: 100 in stock

Description

Description
Will be camping Moon Co., steel pegs T- series. In the feature was using a machine structural carbon steel S45C steel is a product that is very popular in foreign countries.
Since the hardness is more than 200Hb, made of steel, which are distributed in the market (mostly S35C castings, about hardness 120Hb) and distinguishes itself.
Since it is a fragile hard to the features driving even in hard ground, gravel, can be used in places such as the ground is hard place.
T-20 8 Set
Size: 200mm (head / ƒÓ15mm, implant part / ƒÓ8mm ellipse)
Weight: about 113g / pc (8 present a total of 900g)
T-30 8 Set
Size: 300mm (head / ƒÓ15mm, implant part / ƒÓ8-9mm ellipse)
Weight: about 200g / pc (8 present a total of 1.60kg)
T-40 6 Set
Size: 400mm (head / ƒÓ15mm, implant part / ƒÓ8-9mm ellipse)
Weight: about 285g / pc (6 present a total of 1.55kg)
Common
Material: carbon steel S45C for mechanical structure
Features:. 1 mechanical hardness 200HB or 2. painting ear excellent cationic electrodeposition 3. hook portion to rust performance can be prevented from coming off that rope is not rotated hooked, the stake
Use: to set-up in such as lawn and gravel.
Note: Due to the manufacturer's favor, but there is a case to be included with the luminous float rubber as a bonus, since you can not guarantee that is included with all products, Please note.
Product Features
1. machine structural carbon steel S45C used for
Use the S45C machine for special steel that has been heat-treated.
Since the hardness is more than 200Hb, it is characterized by easy to be implanted in the hard ground.
2. missing prevention design
Ear of the hook part will prevent the escape of the rope.
3. round hole
A round hole has just caught design hook of Peguhanma.
Attachment of rope also possible.
4. cylindrical head
We are the most driving easy to cylindrical.
Has been humbly processing the tip, prevent injury when you've been hit.
5. spread of the force-receiving surface
Because the force-receiving surface is a TairaTadashi yen of 15mm, for us to successfully absorb the blow with the angle from the hammer.
For wish of steel pegs
Processing of the head portion
�›: humbly it is treated, a large force-receiving area, will convey to the downward blow to vertical.
X: If the head is not able to process humbly, not direction is stable in can not peg is absorbed well the blow with the angle from the hammer.
Spread a force-receiving surface
�›: head (driving) part of the long, will be driving easy structure. We are processing the sharp tip to Tairaka.
X: head (driving) part of the short, it takes extra force to driving. Because the tip is a blunt, you should pay attention as you do not hurt.
The material and make
�›: Use the hardness performance is high S45C.
X: Most have been market distribution is low hardness performance
Because of the S35C, a limited scene to be used
to come.
�›: corner welding of meat all-line
* Steel camping Moon in 2003
First published the fillet all-line welding of the peg
Did. A lot of imitation goods distribution now all over the world
It has been, but, because welding is rough, the surface of the
Burr is can cause damage to the rope stop.
�›: the design of the hook ear
* Ear structure of prevention omission of the rope is already get the design right.
It is made longer further hook ear, high winds
For us ease the worry of missing rope by.
how to use
Angle of guy line and peg at a right angle (90 degrees).
Pegs, tilted so that the angle of the ground and 60 degrees in the direction of the tent opposite. If possible, I would like you devote myself until the place is closer to the ground guy line.
If there is a Peguhanma, you can pull out the principle of leverage by utilizing the rear portion of the hook.
Over another peg to peg of the hook that is dedicated to the ground, pulling or, unplug while twist lightly.
Such as pre-wash the mud stains, please let as much as possible dry.
Payment
We accept PayPal only.
We usually ship within 5 business days of receiving cleared payment.
Our return policy, In the only case of unopened item package.
We ships from Japan this product. Import duties, taxes, and charges are not included in the item price or shipping cost. These charges are the buyer�fs responsibility.
Shipping
Shipping by DHL; expedited shippment takes about 1-4 business days
+ handling time about 5 business days.
International Shipping;
Some countries are applied to EMS.
Almost all countries are applied to Expedited Shipping /DHL
International Buyers - Please Note:
* Import duties, taxes and charges are not included in the item price or shipping charges. These charges are the buyer's responsibility.
* Please check with your country's customs office to determine what these additional costs will be prior to bidding/buying.
* These charges are normally collected by the delivering freight (shipping) company or when you pick the item up - do not confuse them for additional shipping charges.
* We do not mark merchandise values below value or mark items as "gifts" - US and International government regulations prohibit such behavior.
* Customs procedures take time and delivery may be delayed.